Please use this identifier to cite or link to this item: http://repositoriosenaiba.fieb.org.br/handle/fieb/965
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorAlbuquerque, Rosana Vieira-
dc.contributor.authorOliveira, Diego de Araújo de-
dc.date.accessioned2020-09-24T14:09:37Z-
dc.date.available2020-09-24T14:09:37Z-
dc.date.issued2017-09-08-
dc.identifier.citationOLIVEIRA, Diego de Araújo de. Automatização de um poço de petróleo de bombeio de cavidades progressivas (BCP), no município de Candeias - Bahia. Orientadora: Rosana Vieira Albuquerque. 2017. 95 f. TCCP (MBA Executivo em Gestão de Projetos) – Faculdade de Tecnologia SENAI CIMATEC, Salvador, 2017.pt_BR
dc.identifier.urihttp://repositoriosenaiba.fieb.org.br/handle/fieb/965-
dc.description.abstractProjeto de Automatização de um poço de petróleo de bombeio de cavidades progressivas (BCP), que surgiu da necessidade de monitoração, controle e otimização local, sendo supervisionado remotamente, o conjunto de variáveis, via sala de controle. O projeto prevê a contratação de recursos necessários ao desenvolvimento das atividades definida, no escopo e demais planos elaborados conforme o PMBOK. O objetivo do projeto será entregar um abrigo construído para e equipados com equipamentos de controle devidamente configurados e parametrizados para atender o pleno funcionamento do poço de petróleo. Sua realização está orçada em aproximadamente R$ 181.000,00 e com tempo estimado para conclusão em aproximadamente três meses. Espera-se que a realização desse projeto viabilize não apenas a otimização do processo, como também uma análise dos registros de informações na operação do poço, incluindo o comportamento do bombeio e informações relevantes para a análise do desempenho dos equipamentos e principalmente permita ao operador um acompanhamento detalhado a fim de identificar e antecipar problemas no bombeio, com isso reduzindo as perdas de produção. ABSTRACT: Automation Project for a progressive cavity (BCP) oil well, which arose from the need for local monitoring, control and optimization, being supervised remotely, the set of variables, via the control room. The project provides for the contracting of resources necessary for the development of defined activities, in the scope and other plans elaborated according to the PMBOK. The objective of the project will be to deliver a shelter built for and equipped with control equipment properly configured and parameterized to meet the full operation of the oil well. Its realization is estimated at approximately R$ 181,000.00 and estimated time to completion in approximately three months. It is expected that the realization of this project will allow not only the optimization of the process, but also an analysis of the information records in the operation of the well, including the behavior of the pump and relevant information for the analysis of the performance of the equipment and mainly allow the operator a detailed monitoring to identify and anticipate pumping problems, thereby reducing production losses.pt_BR
dc.language.isopt_BRpt_BR
dc.publisherCentro Universitário SENAI CIMATECpt_BR
dc.rightsacesso abertopt_BR
dc.subjectGestão de projetospt_BR
dc.subjectPMBOKpt_BR
dc.subjectAutomatização de poço de petróleopt_BR
dc.titleAutomatização de um poço de petróleo de bombeio de cavidades progressivas (BCP), no município de Candeias – Bahiapt_BR
dc.title.alternativeAutomation of a progressive cavity pumping oil well (BCP) in the municipality of Candeias - BahiaIn
dc.typemonografiapt_BR
dc.embargo.termsabertopt_BR
dc.publisher.countrybrasilpt_BR
dc.publisher.departamentCentro Universitário SENAI CIMATECpt_BR
dc.publisher.programPROGRAMA DE PÓS-GRADUAÇÃO LATO SENSU MBA EXECUTIVO EM GESTÃO DE PROJETOS SENAI CIMATECpt_BR
dc.publisher.initialsSENAI CIMATECpt_BR
dc.subject.cnpqAdministraçãopt_BR
dc.contributor.refereesZoia, Luiz Carlos Mendes-
dc.identifier.doihttp://repositoriosenaiba.fieb.org.br/retrieve/b2acf2b3-6b6c-4a05-9a95-b6b8dd5009ce/TCCP_DIEGO%20DE%20ARA%c3%9aJO%20DE%20OLIVEIRA.pdf-
Appears in Collections:Monografias (Pós-Graduação) - MBA Executivo em Gestão de Projetos

Files in This Item:
File Description SizeFormat 
TCCP_DIEGO DE ARAÚJO DE OLIVEIRA.pdfTCCP / MBA EXECUTIVO EM GESTÃO DE PROJETOS1.97 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.